¡CELEBREMOS A MÉXICO A LO GRANDE! CON LIBROS Y SUPER DESCUENTOS   Ver más

Enviar a
CUAUHTÉMOC, Ciudad de México
0
  • argentina
  • chile
  • colombia
  • españa
  • méxico
  • perú
  • estados unidos
  • internacional

Selecciona tu país

América

Europa

Resto del mundo

portada Production Leveling in the Scope of Bosch Production System: Produktionsnivellierung Bosch Produktions System bps (Heijunka) (en Inglés)
Formato
Libro Físico
Editorial
Idioma
Inglés
N° páginas
70
Encuadernación
Tapa Blanda
ISBN13
9783668554948

Production Leveling in the Scope of Bosch Production System: Produktionsnivellierung Bosch Produktions System bps (Heijunka) (en Inglés)

Johannes Köck (Autor) · Grin Verlag · Tapa Blanda

Production Leveling in the Scope of Bosch Production System: Produktionsnivellierung Bosch Produktions System bps (Heijunka) (en Inglés) - Johannes Köck

Libro Nuevo Importado
Envío: 22 a 27 días háb.
$ 1,736.78$ 1,042.07
-40%
Costos de importación incluídos en el precio ✅
Libro Nuevo

Quedan 10 unidades

$ 1,042.07
¡Envío Gratis!  Llega entre el 06 Oct y el 14 Oct a CUAUHTÉMOC, Ciudad de México. Seleccionar ubicación

Reseña del libro "Production Leveling in the Scope of Bosch Production System: Produktionsnivellierung Bosch Produktions System bps (Heijunka) (en Inglés)"

Bachelor Thesis from the year 2013 in the subject Business economics - Supply, Production, Logistics, grade: 1,3, University of Applied Sciences Esslingen, language: English, abstract: Implementing Heijunka usually includes the implementation of production leveling and the implementation of a kanban pull system. This process, in the scope of the Bosch Production System, will be part of the following thesis. After a short introduction of the Robert Bosch GmbH and particularly of Bosch in China in chapter two, a theoretical part will follow in chapter three. In this paragraph the author of this thesis wants to introduce some basic elements and core principles about the Toyota- and the Bosch Production System. Moreover, some production control methods will be explained. Chapter four, the practical and main part of this thesis, is devoted to the whole Heijunka implementation process in the respective plant of Bosch, Wujin plant. At the beginning, the current state of the value stream and the target state of the value stream are compared with each other. The next step will cover the preparations and finally the selection of a suitable value stream. The supermarket calculation and future steps are also included in chapter four. However, chapter four also contains some theoretical explanations to provide a bigger picture and to link theory to the practical implementation. Finally, the author will move to the last chapter of this thesis, which shall deal with a short review of this project.

Opiniones del libro

Preguntas frecuentes sobre el libro

Todos los libros de nuestro catálogo son Originales.
El libro está escrito en Inglés.
La encuadernación de esta edición es Tapa Blanda.

Preguntas y respuestas sobre el libro

¿Tienes una pregunta sobre el libro? Inicia sesión para poder agregar tu propia pregunta.

Opiniones sobre Buscalibre

Ver más opiniones de clientes