ESTE REGRESO A CLASES, ENCUENTRA MILLONES DE LIBROS CON DESCUENTO   Ver más

Enviar a
CUAUHTÉMOC, Ciudad de México
0
  • argentina
  • chile
  • colombia
  • españa
  • méxico
  • perú
  • estados unidos
  • internacional

Selecciona tu país

América

Europa

Resto del mundo

portada An Analysis of the Acquisition Process for Simplified Acquisition of Base Engineering Requirements Contracts and Its Potential Impact on Contractor Pe (en Inglés)
Formato
Libro Físico
Editorial
Idioma
Inglés
N° páginas
104
Encuadernación
Tapa Blanda
Dimensiones
24.6x18.9x0.6 cm
Peso
0.20 kg.
ISBN13
9781288409150
Categorías

An Analysis of the Acquisition Process for Simplified Acquisition of Base Engineering Requirements Contracts and Its Potential Impact on Contractor Pe (en Inglés)

Brian J. Heaps (Autor) · Biblioscholar · Tapa Blanda

An Analysis of the Acquisition Process for Simplified Acquisition of Base Engineering Requirements Contracts and Its Potential Impact on Contractor Pe (en Inglés) - Heaps, Brian J.

Libro Nuevo Importado
Envío: 17 a 22 días háb.
$ 943.54$ 471.77
-50%
Costos de importación incluídos en el precio ✅
Libro Nuevo

Quedan 100 unidades

$ 471.77
Llega entre el 25 Sep y el 05 Oct a CUAUHTÉMOC, Ciudad de México. Seleccionar ubicación

Reseña del libro "An Analysis of the Acquisition Process for Simplified Acquisition of Base Engineering Requirements Contracts and Its Potential Impact on Contractor Pe (en Inglés)"

The Simplified Acquisition of Base Engineering Requirements (SABER) contract's main purpose is to expedite contract award of civil engineer requirements through the issuance of individual delivery orders. The contract contains a collection of detailed task specifications that include most types of real property maintenance, repair, and construction work. The Assistant Secretary of the Air Force for Acquisition's Operational Contracting Division (SAF/AQCO) identified a number of failed SABER contracts. The problem statement designed for this research effort was: There are a large number of SABER contractors that are failing during the performance period on their SABER contracts. SAF/AQCO is trying to identify whether any Government actions or procedures are negatively impacting the contractor's ability to perform satisfactorily on the SABER contract. This research effort focused on five areas within the SABER process that is controlled by the Government. A qualitative approach using case study analysis was used. Seven SABER contracts were selected as case studies. The research did not identify any Air Force-wide procedures in the five areas that negatively impacted the contractor's ability to perform satisfactorily on the contract. The research identified two areas of potential follow-on research.

Opiniones del libro

Preguntas frecuentes sobre el libro

Todos los libros de nuestro catálogo son Originales.
El libro está escrito en Inglés.
La encuadernación de esta edición es Tapa Blanda.

Preguntas y respuestas sobre el libro

¿Tienes una pregunta sobre el libro? Inicia sesión para poder agregar tu propia pregunta.

Opiniones sobre Buscalibre

Ver más opiniones de clientes